In 2019 we were called up to assist Hastie Building Group with a Unit build at Oxford Street in Balmoral for 7 luxury units. The period we were onsite for was around 3 months and the type of lifts we were required to carry out included things like lifting concrete blocks, trusses, timber frames and finally roofing. Depending on the position and location of each drop, depended on which crane was required at the time. We had our 16T slew crane, 20T franna and our 55T mobile crane out on-site over the 3 months period